Water and Sewer Networks

The work to be done consists of trenching, laying water main, services, hydrants, and other necessary appurtenances, backfilling the trench, and properly completing the work of water and sewer main construction at locations called for following plans approved by and at a time required by The owner specifications.

DUCTILE and CAST IRON / HDPE / GRP / FRP and RCP

The water in the supply network is maintained at positive pressure to ensure that water reaches all parts of the network, that a sufficient flow is available at every take-off point and to ensure that untreated water in the ground cannot enter the network. The water is typically pressurized by pumps that pump water into storage tanks constructed at the highest local point in the network.